Вопрос № 74022 - Английский язык

Расположите пропущенные предложения в таком порядке, чтобы получился связный текст
1______________. It is more than 20 kilometres long. 2___________. They started on opposite sites and met in the middle under the sea. They used specially-designed tunnel boring machines (TBMs) to dig the tunnels through the rock under the seabed. 3____________. The machines used to dig the main tunnels were about 8.5 metres in diameter and 250 metres long. Work started in 1987 and the teams met under the seabed in 1991.4___________.
Варианты ответов
  • The channel tunnel is between Britain and France.
  • The first passenger train went through in 1994.
  • It was built by British and French engineers.
  • TBMs  are enormous machines for digging tunnels.
Правильный ответ
Помогли ответы? Ставь лайк 👍
Расскажи другу:
Вопрос задал(а): Alex, 23 Декабрь 2015 в 20:49
На вопрос ответил(а): Любимов Павел, 23 Декабрь 2015 в 20:50