Прочитайте текст и выполните задания Hurricane preparation tips for construction sites 1. Local emer...: ответ на тест 1110517 - Английский язык

Прочитайте текст и выполните задания
Hurricane preparation tips for construction sites
1. Local emergency operations officials and the National Weather Service will provide hurricane landfall probabilities. Approximately 60 to 48 hours before the hurricane is expected to make landfall, consider cancelling the delivery of building materials to all job sites except any materials needed to secure the building site from storm damage. While contractors generally don't want to stop or delay construction activities, the 48- to 24-hour window before landfall is the suggested time to stop all construction activity. It's important to note that most local building departments generally stop field inspections, except for those related to pouring columns, tie beams, wet decks, floors and similar structural items, during this time as well. Contractors are encouraged to activate their hurricane job site plan during this window of time.
2. They notify subcontractors to help secure the building site. Helpful hints for site protection include: secure all job sites, giving priority attention to those located in the most populated areas; clean up all construction debris; tie or band together all loose plywood and lumber; secure other loose building supplies; remove permit board and all job site signage; locate and turn off electricity, water and gas.
3. Also, secure all portable toilets. Portable toilets can also be anchored adjacent to L-shaped walls of the home under construction and they can be weighted down with concrete blocks or sand. After the site is secure, advise subcontractors to leave and not return until the hurricane threat has passed. Make sure to have contact numbers for all subcontractors stored in a secure and dry place and that they know who will contact them after the hurricane passes.
Ответьте на вопрос:
What are the two ways to secure portable toilets?
Варианты ответов
  • Portable toilets are removed from the construction site or they are secured when contactors cover the toilets with tents.
  • Contractors usually clean the portable toilets or hire special companies to remove them from populated areas.
  • Portable toilets can be attached to walls of buildings being constructed or they can be made heavier using building materials from the construction site.
  • Contactors turn off gas and water and after that remove the toilets or warn people about possible danger.
Правильный ответ
Помогли ответы? Ставь лайк 👍
Расскажи другу:
Вопрос задал(а): Анонимный пользователь, 13 Ноябрь 2020 в 19:43
На вопрос ответил(а): Анастасия Степанова, 13 Ноябрь 2020 в 19:43
Все Предметы (168)