The Tay Bridge in Scotland was designed and built by Sir Thomas Bouch. 1_______. The bridge, which was over 3 kilometres long, opened in 1878 and fell down in a winter storm in 1879. 2_______.
There was the enquiry into the Tay Bridge disaster to find out why the accident happened. One of the constructions was that the design and construction were based on quickly and cheaply it could be built. Safety and strength were not thought about properly. 3___________ . Also, the design was based on experience rather than the more scientific and accurate calculations used today. 4___________. The results confirm that the design of the bridge was definitely substandard.
Варианты ответов
  • A train carrying 70 people was on the bridge at the time and all the people were killed.
  • Another conclusion was that it was a very cold winter and the iron may have cracked when it contracted.
  • It was built in the nineteenth century.
  • During the twentieth century engineers used computers to do a detailed structural analysis of the design used for the Tay Bridge.
Правильный ответ
Помогли ответы? Ставь лайк 👍
Расскажи другу:
Вопрос задал(а): Анонимный пользователь, 13 Ноябрь 2020 в 01:37
На вопрос ответил(а): Анастасия Степанова, 13 Ноябрь 2020 в 01:37
Все Предметы (168)